Haughton and Young were awarded the mechanical services for the construction of Google Link Bridge which links the 3 buildings occupied by Google in Barrow Street.

This was particularly challenging project to air-condition as it’s predominately a glass structure. These challenges were embarked and achieved by the provision of 2 plant areas utilized the raised access floor as a plenum to deliver conditioned air into the space via swirl diffusers.

Scope of Works

Mechanical Services Installation

  • AHU Installation
  • Variable Speed Drives
  • Extract Fans
  • Attenuators
  • Floor Diffusers
  • Automatic Controls
  • BMS
  • Testing & Commissioning
  • H&S and O&M Manuals

Project Team

Architect BKD Architects
M/E Consultant Axis Engineering Consulting Engineers
Main Contractor Bennett Construction
Project Duration February 2014 – June 2015