HYL were awarded the mechanical services contract for the extension to the existing hotel facility, consisting of two separate phases for the Clayton Hotel Group at Dublin Airport.

Phase 1 consisted of a new restaurant, functions rooms, bars, kitchen and back of house office facilities at ground floor level Phase 1 also included. The refurbishment of the 1stfloor to include 35 newly constructed en-suite luxury bedrooms.

Phase 2 consisted of the construction of 2 new additional floor levels, which contains of 106 luxury en-suite bedrooms. This phase also included the upgrading and extension of the BMS Controls Systems.

Scope of Works

Mechanical Services Installation

  • Variable refrigerant Flow (VRF)
  • Air-conditioning System Services Bedrooms
  • Fresh Air Supply & Extract Ventilation System
  • LPHW Services Installation
  • Hot, Cold and Mains Water Services Installation
  • Gas Services Installation
  • Soils & Waste Installation
  • BMS Controls System
  • Testing & Commissioning
  • H&S and O&M Manuals

Project Team

Architect Studio Designs Squared
Quantity Surveyors MGM Partnership
M/E Consultant Dynamic Design Consultants
Main Contractor JJ Rhatigan Building Contractors
Project Duration 12 Months