HYL were awarded the complete installation of this 10,000 sq m 204 bed four-star hotel. The design of the building has 3 individual sections to fit with the geometry of the site at Blackpitts, Mill Street in Dublin 8

The design is cutting-edge and is considered as one of the top hotels in Ireland with a LEED Gold rating.

The project consists of 204 bedrooms and associated facilities. The hotel is 7 storey above ground level with a further 2 levels below ground. There are separate plant spaces in the basement, seventh floor and roof level.

This challenging project was delivered on programme and within budget in conjunction with BAM’s dedicated services and construction team. All MEP services were coordinated by HYL using the latest “In-House” BIM technology

Scope of Works

Mechanical Services Installation

  • Variable Refrigerant Flow (VRF) Air-conditioning System Serving All Bedrooms
  • Fresh Air Supply & Extract Ventilation System
  • LPHW Services in Common Areas & Back of House
  • Hot, Cold and Mains Water Services Installation
  • Natural Gas Services (in plantrooms & Kitchens)
  • Soils & Waste Installation
  • BMS Controls System
  • Testing & Commissioning
  • H&S and O&M Manuals

Project Team

Architect Plus Architecture
Quantity Surveyors Linesight
M/E Consultant Ethos Engineering
Main Contractor BAM
Project Duration 17 Months
 

 